News

News

State Water Board takes comments on Ventura River watershed at June 9 webinar

AGAIN 5 21 Ventura river at Foster ParkState Water Board Website photo 

Ventura River at Foster Park 

The State Water Board and Los Angeles Regional Water Quality Control Board will hold a series of webinars to provide information and solicit comments on the development of a Groundwater-Surface Water Model and Nitrogen Transport Model of the Ventura River watershed.

• Webinar 3 is on Wednesday June 9, 9 a.m. to noon: Groundwater-Surface Water Model: Calibration and Validation

For information on all the webinars, including a recording of the May 5 and May 19 webinars on updates to geologic analysis, visit HERE.

For more information and the webinar log-in information, visit HERE.

The webinars will also include a brief update on development of the Nitrogen Transport Model of the Ventura River Watershed (Nitrogen Model). 

Each webinar will include technical presentations and time for questions and discussion. 

To participate, use the links below to RSVP. Each meeting has a unique RSVP link. If you would like to join multiple webinars, you must RSVP for each. 

After registering for each meeting, you should receive an email with participation instructions. 

Webinar schedule and topics

    • Webinar 2: Wednesday May 19, 9 a.m. to noon: GW-SW Model: Water Demand and Distribution 

Click HERE to RSVP for second webinar. 

    • Webinar 3: Wednesday June 9, 9 a.m. to noon: GW-SW Model: Calibration and Validation

o Next steps and how to stay involved 

Click HERE to RSVP for third webinar:

SOLICITING TECHNICAL COMMENTS 

Submit technical comments by Friday June 25. Email comments to: This email address is being protected from spambots. You need JavaScript enabled to view it.;

BACKGROUND 

Additional information on the GW-SW Model and Nitrogen Model is available in the following documents2: 

    • Final Study Plan for the Development of Groundwater-Surface Water and Nutrient Transport Models of the Ventura River Watershed (Final Study Plan: https://www.waterboards.ca.gov/waterrights/water_issues/programs/instream_flows/cwap_enhancing/docs/vrw_sp_final.pdf

    • Draft Data Compilation Report for the Development of Groundwater-Surface Water and Nitrogen Transport Models of the Ventura River Watershed (Draft Data Compilation Report) 

    • Draft Sensitivity Analysis Approach Memo for the Development of the Groundwater-Surface Water Model of the Ventura River Watershed (Draft Sensitivity Analysis Approach Memo: https://www.waterboards.ca.gov/waterrights/water_issues/programs/instream_flows/cwap_enhancing/docs/ventura_river/vrw_saa_draft.pdf

STAY CONNECTED 

If you would like to receive emails regarding the Water Boards’ development of the GW- SW Model and Nitrogen Model, as well as related California Water Action Plan efforts, subscribe to the “California Water Action Plan/Statewide Instream Flows” list under the Division of Water Rights on the State Water Board’s Email Subscription List website, which is online at: https://www.waterboards.ca.gov/resources/email_subscriptions/swrcb_subscribe.html 

2 The following documents are available online at the Instream Flow Unit: Ventura River Watershed website: https://www.waterboards.ca.gov/waterrights/water_issues/programs/instream_flows/cwa p_enhancing/ventura_river.html 

If you have questions or would like to make a request for reasonable accommodations for a disability, contact Kevin DeLano at This email address is being protected from spambots. You need JavaScript enabled to view it.
 

 

 

Not a subscriber?  choose your subscription plan.